Engineering, supply, installation and commissioning of 07 CO₂ complete fire supression systems

  • Year : 2020
  • Client : Shell
  • Sector of activity : Oil & Gas
  • Location : Tunisie
  • Engineering, supply, installation and commissioning of 07 CO₂ complete fire supression systems at Miskar A platform, including :
    • Design of new fire supression system in compliance with ATEX requirement.
    • Supply of 07 CO₂ fire supression systems (Cylinders, valves, pipes, pilot cylinder…).
    • Supply of Siren, Discharge pressure switch and odoriser unit.
    • Supply of spare parts.
    • Tunisification of cylinders.
    • Removal of existing systems.
    • Installation of new systems.
    • Commissioning of the installed systems.