automation-icon-28

Supply of 12 new RTU Cabinets for wellhead at MLN field

  • Year : 2019
  • Client : EPPM
  • End user : Pertamina
  • Sector of activity : Oil & Gas
  • Location : Algeria
  • Installation of 12 oil wells control system as part of the development of phase 4 at MLN site, including:
    • Engineering for radio transmission.
    • Simulation of the path propagation.
    • Engineering & programming of the control system.
    • Supply and delivery of the required equipment (CPU, RTU, pylon, solar power supply).
    • Erection & assembly of the cabinets.
    • Integration of the hardware & software.
    • FAT & SAT.
    • Start-up services.
Segitec scroll top
Segitec loading